Overhead Distribution Pillars

The Weber Under Over pillar is another example of the company’s close consultation with utilities throughout Australia.

South Australia’s extensive use of overhead reticulation demands an effective solution for the transition to underground services into dwelling and small commercial premises. After extensive temperature rise testing in Weber’s laboratory at Eight Mile Plains a suitable solution to suit SA Power Networks requirements was developed.

Manufactured Products

Pillars
LV Assemblies - Padmount
LV Assemblies - Chamber Substations
Secondary Systems for Zone Substations

How to contact us

Phone
07 3841 6899

Fax
07 3841 6877

18 McKechnie Drive
Brisbane Technology Park

     

PO Box 4264, Eight Mile Plains
Brisbane Queensland,
4113 Australia

Contact Us