Retrofit solutions for aged assets

As with padmounted substations the aging networks often present design challenges for retrofit indoor substations. On one hand we have the problem of cables that cannot be moved due to aging insulation and on the other hand the limited access to the location present many challenges. Limited access may mean designing and constructed the switchboard in small modules and these modules are then assembled in situ. Such installations require accurate site measurements that are used by Weber’s engineering team to make the required product.